The Blackwell-Hart Technical Bulletins
The Blackwell-Hart Technical Bulletins serve as the professional archive for the BHM™ framework. Founded on 30 years of industrial research, this technical appendix provides clinical protocols for independent innovation and industrial asset scaling.
BHM™ Technical Bulletin 24-13: The Terminal Proof Audit
Finalizing the 2024 "Proof" Phase. A cumulative audit of the 10-Step Logic and the transition to 2025 Industrial Scaling.
The BHM™ Technical Audit: Verifying Integrity Before Industrial Scaling
Forensic technical audit protocol within the Blackwell-Hart Methodology (BHM), focusing on mechanical logic consistency, IP alignment, and the transition from proof of concept to industrial scaling.